Site diary: June 2025
✅ 1st floor:
- underfloor heating has been fully installed;
- the screed has been poured;
- the plastering stage follows
On the second floor, work has started on the plumbing.
The electrical installation is also fully completed on all floors.
We continue the development with the same attention to detail and respect for every technical stage, so that future tenants can enjoy quality, comfort and predictability.